Week Of March 10, 2009
MARCH 10, 2009
Walkways connecting the parking lots to the atrium entrances are being assembled.
Work continues on the elevator, which will take suite holders from the atrium to the upper deck level.
On the concourse level, the press box is nearing its final stages of being re-built.
Accent lights have been installed along the concourse walls.
A view from the first base rooftop deck.
KANE COUNTY COUGARS | 34W002 CHERRY LANE, GENEVA, IL 60134 (630) 232-8811 FAX: (630) 232-8815 | info@kanecountycougars.com
Web design by Millennium Multimedia
sitemap